{"id":5781,"date":"2018-06-26T21:11:21","date_gmt":"2018-06-27T01:11:21","guid":{"rendered":"http:\/\/stclement-ottawa.org\/?p=5781"},"modified":"2026-03-14T20:20:42","modified_gmt":"2026-03-15T00:20:42","slug":"sanctuary-floor-installation-underway","status":"publish","type":"post","link":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/","title":{"rendered":"L'installation du nouveau plancher en cours."},"content":{"rendered":"<p>Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway.\u00a0 Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs whose curved profile match that of the sanctuary enclosure itself.<\/p>\n<p>Spanning the 70 feet width of the transept, the sanctuary enclosure has made the floor installation something of a challenge at times for those installing it whose aim is a faultless fit in the new floor&#8217;s 145 year-old setting. Indeed, the curved profile necessitated the use of one-off computer-assisted design help to ensure the new installation conforms perfectly to the floor&#8217;s profile.<\/p>\n<p>The estimated cost of the completed project is $51, 300 of which $11, 590 has been secured\u00a0 so far by special parishioner donations. If you wish to contribute to the new floor, please use the \u201cMaintenance and Restoration\u201d envelope and please identify the portion you wish to allocate for the sanctuary floor. Thank you for your generous support.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway.\u00a0 Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5784,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-5781","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway. Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"admin\"\/>\n\t<meta name=\"google-site-verification\" content=\"nHeUe0k-Hyiyy46fsK-07sXWLoys-ozjnJYhmIr6HIs\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"fr_CA\" \/>\n\t\t<meta property=\"og:site_name\" content=\"St. Clement Parish - at Saint Anne Church\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"L&#039;installation du nouveau plancher en cours. - St. Clement Parish\" \/>\n\t\t<meta property=\"og:description\" content=\"Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway. Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/stclement-ottawa.org\/wp-content\/themes\/StClement\/logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/stclement-ottawa.org\/wp-content\/themes\/StClement\/logo.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2018-06-27T01:11:21+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-15T00:20:42+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/stclementottawa\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"L&#039;installation du nouveau plancher en cours. - St. Clement Parish\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway. Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/stclement-ottawa.org\/wp-content\/themes\/StClement\/logo.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#blogposting\",\"name\":\"L'installation du nouveau plancher en cours. - St. Clement Parish\",\"headline\":\"L'installation du nouveau plancher en cours.\",\"author\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/author\\\/admin\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/stclement-ottawa.org\\\/wp-content\\\/uploads\\\/2018\\\/06\\\/IMG_2911-1-e1530058527621-450x600.jpg\",\"width\":450,\"height\":600},\"datePublished\":\"2018-06-26T21:11:21-04:00\",\"dateModified\":\"2026-03-14T20:20:42-04:00\",\"inLanguage\":\"fr-CA\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#webpage\"},\"articleSection\":\"News, admin, edeprey, julianmack\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/category\\\/news\\\/#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/category\\\/news\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#listItem\",\"name\":\"L'installation du nouveau plancher en cours.\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#listItem\",\"position\":3,\"name\":\"L'installation du nouveau plancher en cours.\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/category\\\/news\\\/#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/#organization\",\"name\":\"St. Clement Parish\",\"description\":\"at Saint Anne Church\",\"url\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/stclement-ottawa.org\\\/wp-content\\\/themes\\\/StClement\\\/logo.png\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/stclementottawa\\\/\",\"https:\\\/\\\/www.instagram.com\\\/stclementyag\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/author\\\/admin\\\/#author\",\"url\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/author\\\/admin\\\/\",\"name\":\"admin\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#webpage\",\"url\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/\",\"name\":\"L'installation du nouveau plancher en cours. - St. Clement Parish\",\"description\":\"Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway. Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs\",\"inLanguage\":\"fr-CA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/author\\\/admin\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/author\\\/admin\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/stclement-ottawa.org\\\/wp-content\\\/uploads\\\/2018\\\/06\\\/IMG_2911-1-e1530058527621-450x600.jpg\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#mainImage\",\"width\":450,\"height\":600},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/sanctuary-floor-installation-underway\\\/#mainImage\"},\"datePublished\":\"2018-06-26T21:11:21-04:00\",\"dateModified\":\"2026-03-14T20:20:42-04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/\",\"name\":\"St. Clement Parish\",\"description\":\"at Saint Anne Church\",\"inLanguage\":\"fr-CA\",\"publisher\":{\"@id\":\"https:\\\/\\\/stclement-ottawa.org\\\/fr\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"L'installation du nouveau plancher en cours. - St. Clement Parish","description":"Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway. Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs","canonical_url":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"nHeUe0k-Hyiyy46fsK-07sXWLoys-ozjnJYhmIr6HIs","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#blogposting","name":"L'installation du nouveau plancher en cours. - St. Clement Parish","headline":"L'installation du nouveau plancher en cours.","author":{"@id":"https:\/\/stclement-ottawa.org\/fr\/author\/admin\/#author"},"publisher":{"@id":"https:\/\/stclement-ottawa.org\/fr\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/stclement-ottawa.org\/wp-content\/uploads\/2018\/06\/IMG_2911-1-e1530058527621-450x600.jpg","width":450,"height":600},"datePublished":"2018-06-26T21:11:21-04:00","dateModified":"2026-03-14T20:20:42-04:00","inLanguage":"fr-CA","mainEntityOfPage":{"@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#webpage"},"isPartOf":{"@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#webpage"},"articleSection":"News, admin, edeprey, julianmack"},{"@type":"BreadcrumbList","@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/stclement-ottawa.org\/fr#listItem","position":1,"name":"Home","item":"https:\/\/stclement-ottawa.org\/fr","nextItem":{"@type":"ListItem","@id":"https:\/\/stclement-ottawa.org\/fr\/category\/news\/#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/stclement-ottawa.org\/fr\/category\/news\/#listItem","position":2,"name":"News","item":"https:\/\/stclement-ottawa.org\/fr\/category\/news\/","nextItem":{"@type":"ListItem","@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#listItem","name":"L'installation du nouveau plancher en cours."},"previousItem":{"@type":"ListItem","@id":"https:\/\/stclement-ottawa.org\/fr#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#listItem","position":3,"name":"L'installation du nouveau plancher en cours.","previousItem":{"@type":"ListItem","@id":"https:\/\/stclement-ottawa.org\/fr\/category\/news\/#listItem","name":"News"}}]},{"@type":"Organization","@id":"https:\/\/stclement-ottawa.org\/fr\/#organization","name":"St. Clement Parish","description":"at Saint Anne Church","url":"https:\/\/stclement-ottawa.org\/fr\/","logo":{"@type":"ImageObject","url":"https:\/\/stclement-ottawa.org\/wp-content\/themes\/StClement\/logo.png","@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#organizationLogo"},"image":{"@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/stclementottawa\/","https:\/\/www.instagram.com\/stclementyag\/"]},{"@type":"Person","@id":"https:\/\/stclement-ottawa.org\/fr\/author\/admin\/#author","url":"https:\/\/stclement-ottawa.org\/fr\/author\/admin\/","name":"admin"},{"@type":"WebPage","@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#webpage","url":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/","name":"L'installation du nouveau plancher en cours. - St. Clement Parish","description":"Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway. Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs","inLanguage":"fr-CA","isPartOf":{"@id":"https:\/\/stclement-ottawa.org\/fr\/#website"},"breadcrumb":{"@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#breadcrumblist"},"author":{"@id":"https:\/\/stclement-ottawa.org\/fr\/author\/admin\/#author"},"creator":{"@id":"https:\/\/stclement-ottawa.org\/fr\/author\/admin\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/stclement-ottawa.org\/wp-content\/uploads\/2018\/06\/IMG_2911-1-e1530058527621-450x600.jpg","@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#mainImage","width":450,"height":600},"primaryImageOfPage":{"@id":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/#mainImage"},"datePublished":"2018-06-26T21:11:21-04:00","dateModified":"2026-03-14T20:20:42-04:00"},{"@type":"WebSite","@id":"https:\/\/stclement-ottawa.org\/fr\/#website","url":"https:\/\/stclement-ottawa.org\/fr\/","name":"St. Clement Parish","description":"at Saint Anne Church","inLanguage":"fr-CA","publisher":{"@id":"https:\/\/stclement-ottawa.org\/fr\/#organization"}}]},"og:locale":"fr_CA","og:site_name":"St. Clement Parish - at Saint Anne Church","og:type":"article","og:title":"L'installation du nouveau plancher en cours. - St. Clement Parish","og:description":"Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway. Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs","og:url":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/","og:image":"https:\/\/stclement-ottawa.org\/wp-content\/themes\/StClement\/logo.png","og:image:secure_url":"https:\/\/stclement-ottawa.org\/wp-content\/themes\/StClement\/logo.png","article:published_time":"2018-06-27T01:11:21+00:00","article:modified_time":"2026-03-15T00:20:42+00:00","article:publisher":"https:\/\/www.facebook.com\/stclementottawa\/","twitter:card":"summary_large_image","twitter:title":"L'installation du nouveau plancher en cours. - St. Clement Parish","twitter:description":"Work on installing the new engineered hardwood floor that will replace the badly worn carpeting previously in place in the sanctuary is now well underway. Installation is expected to take another two weeks before being complete and when finished, will include a new, larger platform on which the high altar will rest and have stairs","twitter:image":"https:\/\/stclement-ottawa.org\/wp-content\/themes\/StClement\/logo.png"},"aioseo_meta_data":{"post_id":"5781","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2026-03-15 00:25:14","updated":"2026-03-15 00:25:14","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/stclement-ottawa.org\/fr\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/stclement-ottawa.org\/fr\/category\/news\/\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tL'installation du nouveau plancher en cours.\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/stclement-ottawa.org\/fr"},{"label":"News","link":"https:\/\/stclement-ottawa.org\/fr\/category\/news\/"},{"label":"L'installation du nouveau plancher en cours.","link":"https:\/\/stclement-ottawa.org\/fr\/sanctuary-floor-installation-underway\/"}],"_links":{"self":[{"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/posts\/5781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/comments?post=5781"}],"version-history":[{"count":6,"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/posts\/5781\/revisions"}],"predecessor-version":[{"id":13990,"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/posts\/5781\/revisions\/13990"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/media\/5784"}],"wp:attachment":[{"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/media?parent=5781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/categories?post=5781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stclement-ottawa.org\/fr\/wp-json\/wp\/v2\/tags?post=5781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}